The Capital

Israel, Jerusalem

Mixed- use

Under Construction

Ashtrom Construction, through its subsidiary Ashtrom Jerusalem, is currently developing a prestigious mixed-use project in Jerusalem’s entrance district. The project combines luxury residences, modern office spaces, and commercial areas, and is considered a breakthrough in urban planning. Construction is expected to be completed by the end of 2028.

40,000sqm

Office area

19,250sqm

Residential area

2,700sqm

Commercial area

The Capital
The Capital

An Innovative Mixed-Use Project in the Heart of the City

The Capital Jerusalem complex is located in the city’s entrance district - along Jerusalem’s new axis of residential, business, cultural, and tourism activity. The project spans approximately 6 dunams between Jaffa and Shazar Streets and is led by a consortium of developers: the Belilius Group, Ashtrom Properties, Aka Real Estate, and David Drori Ltd.

The complex will feature a residential tower spanning 19,250 sqm, comprising 219 residential units and a comprehensive range of amenities, including a pool and spa complex. In addition, the project will include a 30-story office tower totaling 40,000 sqm, a 2,700 sqm retail floor with street-level shops, and two pavilion buildings that connect the project to a vibrant urban boulevard. The entire complex is built above five levels of underground parking.

The sculptural façade of the buildings, together with meticulous, innovative planning and timeless materiality, sets a new architectural standard that engages in dialogue with Jerusalem’s rich heritage. The project incorporates thin-profile tiles, glass cladding, and slatted ceilings made from industrialized elements, all featured throughout the various lobby spaces.

Ashtrom Jerusalem is executing all phases of construction - from foundation works and structural erection, through planning and logistics, to the installation of electro-mechanical systems, finishing works, and the development of surrounding landscaped areas. The project’s location in a dense urban environment posed several engineering and logistical challenges, primarily due to the lack of staging areas and the constraint of a single equipment unloading point.

The structural works are expected to be completed by the end of 2026, with the overall project scheduled for completion in October 2028